You are hereForums / By Discipline / Mountain (off road) / By Location / Australia / NSW / NSW Trail Advocacy / Planned 570km long track
Planned 570km long track
Was out riding today and came across this sign and I got a little excited.
To sum up, a track/path is getting built from Brooklyn to Goulburn
Now the section in Penrith they are upgrading will have a shared path.
But I don't know if the entire track will all be shared access. I think it should be, and maybe we need to speak up.
I have done a quick google and all I have come up with are these 2 sites.
Hawksbury Harvest
Parliament Proposal
On both pages Mr Kevin Rozzoli's name has appeared.
- Login to post comments
- Bookmark & share
Tags